The development and production of the imaging test platform is completed
2D code scanner inspection system planning and production completed
September ~ October
Synchronization circuit control board firmware development completed (high-speed synchronization technology for light and dark fields)
Synchronization circuit control board firmware development completed (table lookup high-speed synchronization technology)
August
Nangang Exhibition
July
Carbon fiber measurement system equipment order development and installation completed
June
Laser machine assembly completed
February ~ May
The development of the measurement system platform is completed
Planning, development and production of synchronous circuit control board
Laser development and design of Nangang exhibition equipment
January
Camera development and installation completed
2022
December
Resume service platform system completed, including ERP system integration, material labeling (encoding, decoding), cloud-based logging, and traceability search.
October
Camera equipment completed.
May
In development: Resume service platform system
January
Integration of laser single-mode and multi-mode engraving hybrid mode development is completed.
2021
December
Application for invention patent for laser engraving system.
November
The development of laser engraving system and industrial product history system was completed.
June
The development and production of the laser engraving system is completed.
2020
October
The integrated verification of laser engraving quality verifier is completed.
May
SGTIN-96 encoding and decoding, analysis of RFID and barcode data corresponding conversion design is completed.
March
The development, design and production of the RFID system are completed.
2019
August
CAD 3D import mechanical design.
January
Flash controller integration test completed (840,000 LUX).
2018
September
Cing Lian Technology Company established.
August
The development of the four-axis robot arm control system was completed.
The single-axis card integrates the visual alignment platform.
July
The single-axis card is applied to the 4-axis platform (X, Y, Z, R).
June
The barcode scanning + printer + I/O monitoring + peristaltic drip integrated system development was completed.
The development of the three-axis gluing multi-functional system (matrix gluing system) was completed.
May
The axis motion card is combined with the trigger card to develop integrated testing applications.